|
The Philippsburg Nuclear Power Plant is located in Philippsburg in Karlsruhe (district). It is operated by EnBW Kernkraft GmbH. It houses two units, the first a BWR (boiling water reactor) and the second a PWR (pressurized water reactor). For the first unit, parts made for the cancelled Wyhl plant were used. The second unit was originally planned to be a BWR as well but plans later changed. Final disconnection for both units was scheduled for 2011 for unit 1 and 2017 for unit 2, but as of 2010 had been changed to 2026 and 2032 respectively.〔(World Nuclear Association )〕 Following the incident at the Fukushima plant in Japan reactor 1 was closed on 17 March 2011 for a three month moratorium on nuclear power. The outcome of this moratorium was announced on the morning of 30 May 2011 and Philippsburg-1 was named as a plant that would not be returning to generation at the end of the moratorium. ==Gallery== Image:KKP_Maschinenhaus.jpg|unit 1 Image:KKP_Gleis.jpg|unit 2 Image:KKP_Einlauf.jpg|coolant intake Image:KKP_Auslauf.jpg|cooling tower Trifels_KKP.jpg|remote view 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Philippsburg Nuclear Power Plant」の詳細全文を読む スポンサード リンク
|